The forty-year-old facility was designed to support two air handling units with peak cooling of 300 tons. Over time, actual output capacity had decreased by 200 tons. Similarly, the chilled water pumps were underperforming. The chillers and pumps needed to be replaced.

Read More

In 2016, the boilers at a Medical Center in Northern Michigan were replaced. Natural gas consumption information was provided for 2015 and 2017. This report was created to compare the heating performance before and after boiler replacement.

Read More

Since 2005, Synergy has been a trusted source for client-focused complete solutions that maximize educational building performance. When designing educational buildings or renovating existing educational spaces, our goal is the same as that of our Higher Ed & K12 clients: to create the optimum educational facility. We not only support our clients to complete their projects, we…

Read More

This healthcare facility, one of the largest providers of health care services in Michigan, offers a continuum of services and operates multiple campuses throughout the state. Their campus upgrades required a systems analysis and design of approved recommendations of both the chilled water plant, boiler plant that services the campus, and provide commissioning services for the major renovation and 150,000 sf inpatient expansion. The performance and efficiency of these upgrades made it possible to improve service of the main campus as well as bringing on-line the 150,000 sf of new space with an actual Net Decrease in Energy Consumption and an annual savings of nearly $500,000.

Read More